We have identified preliminary route options for the 144 kV transmission line and a proposed site for the Lanfine substation. we have selected options that:
- Avoid homes and minimize impacts on residences
- Follow property boundaries whereverr possible to provide access and to avoid impacts to agriculture
- Minimize impacts on built-up areas, highways, oil and gas operations and communication facilities
- Minimize impacts to environmentally sensitive areas such as designated historical sites
Other options for transmission line routes may be considered if identified through our consultation process. The preferred transmission line route will be identified after we have considered feedback and concerns.